Home | Telephony | Computers | CRTs | About | Contact | Files Section | Links | Change Log | RSS
Nortel | Lucent | Cisco ISRs | General
Documentation | DMS-100/SL-100/CS-2000/CS-2100 | Meridian 1
Story | EDRAM | Blog | Files | Wanted

SL-100 Web Log


Tone Generation With EDRAM

January 27th, 2024-January 1st, 2025


PRL Card Datafill and Loading

October 11th, 2024


Imaging The NTSX06BA PRL Card

September 15th, 2024-October 7th, 2024

I buy an NTSX06BA and take a disk image of it.


IBN Customer Groups

January 28th-February 10th, 2024

A quick overview of basic IBN/MDC customer group datafill.


Conference Circuits

January 25th-February 3rd, 2024

Setting up the conference circuit cards and provisioning a meet-me conference.


EDRAM and Announcements

January 21st-January 23rd, 2024


ISDN Trunk Routing

January 9th, 2024


Configuring ISDN Trunking

January 7th-January 9th, 2024

Walking through the tables to configure an ISDN trunk group using a T1. Touches on clocking as well.


Configuring a Standard Pretranslator and 6-Digit Translations

December 3rd, 2023

I go through configuring a standard pretranslator and 6 digit translations to enforce 1+10 digit dialing.


Configuring Basic Treatments

December 3rd, 2023

I go through some basic configuration of a minimal set of call treatments.


Adding Basic Translations

November 26th-December 3rd, 2023

Bringing the SL-100 back to a state where it can connect phone calls.


Clearing All of the DMS-100 Tables

October 26th-November 25th, 2023

I finally clear out all the tables on the DMS-100.


How Not To Clear DMS-100 Tables

July 22nd-October 22nd, 2023

I learn a few lessons about table modification on the DMS-100.


VCFMW 18 Presentation: A Crash Course on Moving Big Iron

September 10th, 2023

I gave a presentation on my experiences in moving large, heavy telephone switching equipment at VCFMW 18.


Dumping All Tables

March 4th, 2023

I get a look at all the office data tables as they are, before I start to significantly modify them.


Placing the First Phone Calls

February 22nd, 2023


More Wiring: ENET, LGC, LCM

December 28th, 2022-February 19th, 2023


Shedding Load

December 26th, 2022


Resetting the ADMIN password

December 9th-22nd, 2022


Wiring the power

November 25th-December 8th, 2022


Preparing the DC plant

November 12th-23rd, 2022


Assembling the CS-2100 cabinets

November 20th-21st, 2022


Assembling the SL frames

October 18th-22nd, 2022


Arranging the garage

October 15th, 2022


Powering up the XA-Core

October 07th, 2022


The Original Story

Circa June 2021 through August 2022


Part of the Shadytel Web Ring: previous | next | random
This page was last modified 2025-01-21 19:43:34.242322383 -0600