Home | Telephony | Computers | CRTs | About | Contact | Files Section | Links | Change Log
Nortel | Lucent | Cisco ISRs | General
Documentation | DMS-100/SL-100/CS-2000/CS-2100 | Meridian 1
Story | EDRAM | Blog | Files | Wanted

SL-100 Web Log


VCFMW 18 Presentation: A Crash Course on Moving Big Iron

September 10th, 2023

I gave a presentation on my experiences in moving large, heavy telephone switching equipment at VCFMW 18.


Dumping All Tables

March 4th, 2023

I get a look at all the office data tables as they are, before I start to significantly modify them.


Placing the First Phone Calls

February 22nd, 2023


More Wiring: ENET, LGC, LCM

December 28th, 2022-February 19th, 2023


Shedding Load

December 26th, 2022


Resetting the ADMIN password

December 9th-22nd, 2022


Wiring the power

November 25th-December 8th, 2022


Preparing the DC plant

November 12th-23rd, 2022


Assembling the CS-2100 cabinets

November 20th-21st, 2022


Assembling the SL frames

October 18th-22nd, 2022


Arranging the garage

October 15th, 2022


Powering up the XA-Core

October 07th, 2022


The Original Story

Circa June 2021 through August 2022


Part of the Shadytel Web Ring: previous | next | random
This page was last modified 2024-10-13 19:31:05.501578508 -0500